Categories: Energy

Norway’s largest oil pipeline now in place

The FINANCIAL — The last pipe of what is now Norway’s longest and largest oil pipeline was installed right next to the riser platform at the Johan Sverdrup field. The 36-inch pipeline extends 283 km from the Mongstad oil terminal outside Bergen to the giant field in the North Sea.

The vessel Saipem Castorone began pipelaying operations at Mongstad in late April this year. After, the pipeline was laid through the Fensfjord before the vessel set course for the Johan Sverdrup field. The operations have been executed with high quality and no serious incidents.

With the oil pipeline installed Saipem Castorone is now getting ready for the next stage – laying the 156 km long gas pipeline that will extend from the Johan Sverdrup field to the Statpipe pipeline, from where gas from the field will eventually be shipped to Kårstø. The pipeline installation operations are expected to be completed during the autumn.

“We have spent many years with Saipem planning these operations. We’re all very aware of the size of the task, with several months at sea with a significant installation scope. The key is to follow the thorough plans that we’ve prepared and maintain our significant focus on HSE along the way, until also the gas pipeline is in place,” says Tor Kåre Egelandsdal, responsible for the pipeline installation and the contract with Saipem.

When the pipeline operations are complete, the 2018 Johan Sverdrup installation campaign will be over. With three jackets, two topsides, one bridge, over 400 km of pipelines, and 200 km of power cables, the 2018 campaign is probably the busiest installation campaign ever for a project on the Norwegian continental shelf. And in 2019 the last two topsides and remaining bridges will be put in place before startup of the first phase of the Johan Sverdrup development expected in November next year.

 

The FINANCIAL

Recent Posts

Ukraine billionaire Ihor Kolomoisky targeted in new anti-corruption swoop

Ukraine has launched a fresh wave of anti-corruption raids on high-profile figures, including one of…

23 hours ago

Marburg vaccine shows promising results in first-in-human study

A newly published paper in The Lancet shows that an experimental vaccine against Marburg virus…

3 days ago

Maintenance Tips for Fire Extinguishers

How to maintenance fire extinguisher? Fire extinguishers are an important safety device in any home…

3 days ago

EBRD invests €218 million in the Georgian economy

The European Bank for Reconstruction and Development (EBRD) supported Georgia’s economy to the tune of…

3 days ago

Chinese DJI Drone Business is Blooming in Russo-Ukrainian War

Metinvest Group presented 100 DJI Mavic 3 drones to the Armed Forces of Ukraine (AFU),…

3 days ago

Second Bank Employee Admits Role in Fraud Conspiracy

PROVIDENCE –  Another former bank employee today admitted to a federal judge that she stole…

1 week ago